At the top
Five figures, each a link to the matching filtered list:
The five figures, with the compliance rate beneath them.
Needs attention
Subcontractors that are not compliant, worst first: requirements not met, then documents to confirm, then policies expiring soon. The card lists the first eight; View all opens the full list. Select one to open its page. When there are none, the card reads Every subcontractor is compliant.
Needs attention: the subcontractors to deal with first.
Where the gaps are
Critical findings counted by coverage, so you can see whether the problem is, for example, umbrella limits across the board or one subcontractor’s auto policy.Certificates just in
Files sent by subcontractors through their upload link that nobody has read yet, up to eight. Select one to open the subcontractor and record it. The card is only shown while there is something waiting; every unread file is also on the Certificates page.
Certificates just in appears while a file is waiting to be read.
Chasing
A summary of renewal reminders: how many are Queued, and how many chase emails were Sent in the last 30 days (emails, not individual reminders). If any chase email could not be sent in the last 7 days, the card says how many; the reason is beside each one under Reminders. Review the chase queue opens Reminders.
The Chasing card: reminders queued, emails sent, and whether anything is going out.
Actions
- Export register downloads the CSV register.
- Re-check all re-checks every subcontractor and generates due reminders in the background. The header then says when every subcontractor was last re-checked. It is also in the command palette (Ctrl+K / Cmd+K) as Re-check every subcontractor. Like any other change, it is not available once a trial has ended with no plan active.

Export register and Re-check all, at the top of Overview.
First run
While there are no active subcontractors, including after archiving them all, Overview shows Welcome to WatchMyCover with two steps: Bring your subcontractors in (Import a spreadsheet or Add one by hand) and Check what you require (Review your requirements).
Overview before any subcontractor is added: the two steps to a first answer.